Successful Installation of Ballast Water Treatment System on largest UV type Vessel

Albion Marine is proud to announce that recently we have completed the installation of 2 twin 1500m3/hr Alfa Laval Ballast Water Treatment Systems on the largest UV type of Vessel at Remontowa Ship Repair Yard, Poland, with great success.

As per the International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004, which has been in effect since 2017, it's necessary for vessels from all countries to manage their Ballast Water and to follow the same rules and safety precautions to protect our ecosystem and biodiversity. 

Albion marine has vast experience worldwide and can help you in the installation of Ballast water treatment systems. Moreover, it provides turn-key" BWTS retrofit packages which include: Project Planning, BWTS Selection, Optimized Shipboard Survey and 3D Scan, Basic Engineering, Detailed Engineering, Logistic and Procurement Support, Installation, Completion and Commissioning, Crew Training, Operation Support and Ballast Water Sampling Services. Albion Marine Engineers and technical professionals are trained in all aspects and will do everything in compliance with the International Maritime Organization's (IMO) guidelines.